Maine Air National Guard – Various Paving

Work consisted of reconstruction and paving of four locations: Main Gate, Building 420 (Parking Area), Building 510 (Building Area) and Glenn Avenue. The projects required extensive scheduling and coordination due to ongoing base activities. Testing, documentation, traffic control, daily and weekly meetings were critical to project coordination. Pavement and sub-base was removed with careful consideration for existing utilities. Drainage concerns were evaluated and addressed. The corrected sub-base and geo-textile were installed and compacted. The HMA placement was performed according to specifications and turf was established in surrounding areas. In addition, retaining walls, concrete walkways, pavement markings and signage were installed.

Project Details

  • Barrier, Erosion Control, Traffic Control and Area Closures
  • Removed existing HMA
  • Excavated base course and sub-base materials
  • Installed Geo-textile
  • Compacted new sub-base and base materials (Type A & D Gravels)
  • HMA Pavement Placement
  • Pavement Markings
  • Landscaped including: Loam/Seed and establishment of turf grasses
  • Installed retaining Wall
  • Installed new sidewalk, signage, detectables, bollard covers &
    granite curbing
Company: Lander Group, LLC
Owner: Department of Defense (DOD)
Year: 2015
Location: Maine Air National Guard, Bangor, Maine